⚙️ MCC Design Schedule

← Back to Toolkit

Build your Motor Control Center lineup. Enter HP and the tool auto-fills FLA (NEC Table 430.250), NEMA starter size, wire size, and breaker trip. Edit any field to override.

MCC Information
Motor / Load List
# Load Name HP FLA Starter NEMA Size Breaker (A) Wire Duty

Green columns auto-fill from NEC tables. FLA from Table 430.250 (460V). Breaker at 250% FLA per 430.52. Override any value manually.

Load Summary
0
Total HP
0
Total FLA
0
Demand FLA (80%)
0
Buckets

Schedule = motor list with NEC calcs. Estimate = full MCC project cost with equipment, labor, and engineering.